PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Black Iron duct work leakage test Facing North.jpg Caulking the Stone panels at the North Elevation.jpg Continued installing the Elevator guide rails at Elevator 1,2,3 Facing West.jpg Laying out block at the Electrical Room Facing West.jpg Block work around the UCIA Roof Facing North-West.jpg Installed copper piping for the radiant panels at the 4th floor Facing East.jpg Installed junction boxes at 1st floor cmu wall Facing North-East.jpg
Previous pageNext page Continued installing the Elevator guide rails at Elevator 1,2,3 Facing West